1. Run Lintian in order to test your changes, for example using `sbuild`.
1. If the previous test is successful, push the `master` branch.
1. __If there is a new upstream release__, push `pristine-tar` and `upstream` branches too.
1. Check the [CI state](https://salsa.debian.org/debian/bip/-/pipelines)
1. The status should be `passed`.
1. Check the Lintian messages (list of [Lintian tags](https://lintian.debian.org/tags/)) of the `Lintian` job (look for `lintian --version`). These messages aren't highlighted.